Photovoltac


3S Ladder Hoist application case in photovoltaic panel installation on a rooftop factory in South Africa
With the increasing global attention to renewable energy, South Africa, as an important economy in Africa, is also actively promoting the development of solar power generation projects. The project involved in this case is located in a large factory in an industrial zone in South Africa. The factory has a wide roof space, which is very suitable for installing solar photovoltaic panels to generate renewable energy. In order to complete the installation of photovoltaic panels efficiently and safely, 3S Ladder Hoist was selected as the main lifting equipment.

3S LIFT Ladder Hoist helps install 10-meter rooftop photovoltaics in Bosnia and Herzegovina
In the pursuit of sustainable energy utilization and green development, the Bosnia and Herzegovina region in Europe is actively promoting the construction of rooftop photovoltaic projects.

3S LIFT Ladder Hoist: Empowering Indonesian Client with Efficient Solar Panel Installation
In a large-scale solar installation project in Indonesia, our client encountered a significant challenge: they needed to safely and efficiently hoist over 5,000 solar panels onto the roof of an 8-meter-high building. This task was not only a test of their construction capabilities but also set extremely high demands on the equipment to be used.

3S LIFT Ladder Hoist is used in photovoltaic installation on the roof of a factory in Hong Kong
In Hong Kong, where every inch of land is valuable, the effective use of space resources is crucial. In response to the call for green energy, a factory decided to install a photovoltaic system on the roof. However, how to efficiently and safely complete the installation of photovoltaic panels without affecting the daily operation of the factory has become a major challenge facing the project team.

In Shanghai and Anhui, China, the use of 3S tower climber machines for the installation and maintenance of rooftop photovoltaic panels has increased work efficiency by more than three times
The installation and subsequent maintenance of rooftop photovoltaic panels require workers to have access to the panels. Lifting equipment enables workers to safely and conveniently reach the installation locations, improving installation efficiency and facilitating regular inspections, cleaning, repairs, and component replacements for maintenance tasks.

Customers in Metro Manila, Philippines, use Ladder Hoist to deliver photovoltaic panels to rooftops
Solar home, a customer in Metro Manila, Philippines, previously used the traditional way of moving PV panels to the roof, which was strenuous and dangerous for the workers and slowed down the progress of the rooftop PV installation project.